All Modules
The overall function of the HRSG modules is to generate as much steam as possible from the exhaust gases of the Gas Turbine. Any residual heat is directed out of the stack.
-
1HP Superheater 1 (543 °C at 141.1 bar)
HP Superheater 2 (563.8 °C at 29.51 bar)
Reheater 1 and 2 -
2HP Superheater 3
HP Evaporator -
3HP Economiser 1 (336 °C outlet)
HP Economiser 2 (274 °C outlet)
IP/LP Superheater (303 °C at 30.3 bar)
IP Evaporator (30.7 bar) -
4IP Economiser (62 °C inlet, 210 °C outlet)
LP Evaporator (4.2 bar) -
5HP Economiser 6 (63 °C inlet)
IP/LP Economiser (62 °C at 49 bar)
Feedwater (60 °C at 0.199 bar)